In the first half of 2014, the latest concrete batching plant from Haomei is the new belt type concrete batching plant equipment which has features of elegant appearance, compared with the old machine, the overall size of the new machine has been significantly widened and heightened and productivity has greatly improved.
Professional concrete batching plant manufacturer has summarized five steps for after using the concrete batching plant.
1. After work, shut down the concrete batching plant as requirement according to the right order.
2. Check the wear condition of mixing blades and scaleboard after working; check whether the components need to be updated or the contact surfaces need to be lubricated; check whether the connection bolts are loose.
3. Check the surface of belt conveyor whether it has flake or fracture phenomenon and timely replace.
4. If the mobile batching plant does not work for a long period time and the hopper and storage bin can not save materials, clean inside of it before restarting it. Cement silo should take dampproof work to avoid hardening and freezing of cement.
5. After work, make sure the closing places of concrete batching plant are closed.
We hope that operators should not ignore the above five steps of concrete batching plant. Though these are the simple maintenance, you should take it seriously and earnest which can ensure the safety of concrete batching plant and prolong the service life of concrete batching plant.
Haomei machinery equipment co.,ltd. is located in the famous machinery capital of Zhengzhou, China. We are professional machinery products manufacturer-featuring a wide range of quality concrete batching plant, mobile concrete batching plant, concrete pump, truck mixer, wheel loader, block machine and asphalt mixing plant etc.
Haomei machinery equipment CO., LTD.
Name: ANN MA
Email: ann@haomei.biz
Website: www.haomeibatchplant.com
Office Add: No.14 Waihuan Road, New district, Zhengzhou, China
Tel: +86-371-65621392
Fax:+86-371-86616825
HZS25 Concrete Batching Plant Delivered to Sri Lanka
http://www.haomeibatchplant.com/projectcase/HZS25-Delivered-Sri-Lanka.html
Professional concrete batching plant manufacturer has summarized five steps for after using the concrete batching plant.
1. After work, shut down the concrete batching plant as requirement according to the right order.
2. Check the wear condition of mixing blades and scaleboard after working; check whether the components need to be updated or the contact surfaces need to be lubricated; check whether the connection bolts are loose.
3. Check the surface of belt conveyor whether it has flake or fracture phenomenon and timely replace.
4. If the mobile batching plant does not work for a long period time and the hopper and storage bin can not save materials, clean inside of it before restarting it. Cement silo should take dampproof work to avoid hardening and freezing of cement.
5. After work, make sure the closing places of concrete batching plant are closed.
We hope that operators should not ignore the above five steps of concrete batching plant. Though these are the simple maintenance, you should take it seriously and earnest which can ensure the safety of concrete batching plant and prolong the service life of concrete batching plant.
Haomei machinery equipment co.,ltd. is located in the famous machinery capital of Zhengzhou, China. We are professional machinery products manufacturer-featuring a wide range of quality concrete batching plant, mobile concrete batching plant, concrete pump, truck mixer, wheel loader, block machine and asphalt mixing plant etc.
Haomei machinery equipment CO., LTD.
Name: ANN MA
Email: ann@haomei.biz
Website: www.haomeibatchplant.com
Office Add: No.14 Waihuan Road, New district, Zhengzhou, China
Tel: +86-371-65621392
Fax:+86-371-86616825
HZS25 Concrete Batching Plant Delivered to Sri Lanka
http://www.haomeibatchplant.com/projectcase/HZS25-Delivered-Sri-Lanka.html